{"id":7894,"date":"2023-06-22T14:27:49","date_gmt":"2023-06-22T14:27:49","guid":{"rendered":"https:\/\/est.eu\/templin\/architektonischer-masterplan\/"},"modified":"2023-10-26T09:57:39","modified_gmt":"2023-10-26T09:57:39","slug":"architectural-master-plan","status":"publish","type":"page","link":"https:\/\/est.eu\/en\/templin\/architectural-master-plan\/","title":{"rendered":"Architectural Master Plan"},"content":{"rendered":"\n<style type=\"text\/css\" data-created_by=\"avia_inline_auto\" id=\"style-css-av-lk8eo50v-dd98215d5c750a6f95a7c5a5f4a10acb\">\n.avia-section.av-lk8eo50v-dd98215d5c750a6f95a7c5a5f4a10acb{\nbackground-repeat:no-repeat;\nbackground-image:url(https:\/\/est.eu\/wp-content\/uploads\/2023\/07\/Templin_ArchtektPlan.jpg);\nbackground-position:50% 0%;\nbackground-attachment:scroll;\n}\n<\/style>\n<div id='av_section_1'  class='avia-section av-lk8eo50v-dd98215d5c750a6f95a7c5a5f4a10acb main_color avia-section-default avia-no-border-styling  avia-builder-el-0  el_before_av_one_full  avia-builder-el-first  avia-full-stretch avia-bg-style-scroll av-minimum-height av-minimum-height-custom av-height-custom  container_wrap sidebar_left'  data-section-bg-repeat='stretch' data-av_minimum_height_px='400'><div class='container av-section-cont-open' style='height:400px'><main  role=\"main\" itemprop=\"mainContentOfPage\"  class='template-page content  av-content-small units'><div class='post-entry post-entry-type-page post-entry-7894'><div class='entry-content-wrapper clearfix'><\/div><\/div><\/main><!-- close content main element --><\/div><\/div><div id='after_section_1'  class='main_color av_default_container_wrap container_wrap sidebar_left'  ><div class='container av-section-cont-open' ><div class='template-page content  av-content-small units'><div class='post-entry post-entry-type-page post-entry-7894'><div class='entry-content-wrapper clearfix'>\n<div  class='flex_column av-9gh97-be5094b615507091765efd7f8c4ecc38 av_one_full  avia-builder-el-1  el_after_av_section  avia-builder-el-no-sibling  first flex_column_div  '     ><section  class='av_textblock_section av-li9l96zs-aef1552573c8455111b527be02660b52 '   itemscope=\"itemscope\" itemtype=\"https:\/\/schema.org\/CreativeWork\" ><div class='avia_textblock'  itemprop=\"text\" ><h1>Architectural Master Plan<\/h1>\n<h2>Updated 2022\/2023, first version 2020<\/h2>\n<p>The\u00a0<em>est <\/em>master plan was drafted in 2020. Working with the Potsdam architects K\u00fchn-von Kaehne and Lange and the Berlin planning office Kroschewski Holzrichter, a comprehensive document was produced, as a guide for the transformation of the site into an innovative European school<\/p>\n<p>While the original Joachimsthalsches Gymnasium had a capacity of 180 pupils, the new school will accommodate around 450, with 120 to 150 coming from the region. New visionary buildings are the answer to the future everyday requirements of an innovative school.<\/p>\n<p>The 2020 master plan was based on our framework school concept and contemporary recommendations for the construction of schools in Berlin und Brandenburg. In 2022 and 2023 we adapted the planning and specifics of the rooms and other spaces together with our our <a href=\"https:\/\/est.eu\/en\/school\/experts\/\">team of experts\u00a0for education and school architecture<\/a>. The use of the existing buildings will be optimised and modernised, and new buildings will be added to the ensemble, including:<\/p>\n<ul>\n<li>a research workshop<\/li>\n<li>a new assembly hall, for c. 500 persons<\/li>\n<li>a canteen<\/li>\n<li>a sports\u2019 hall with two playing surfaces<\/li>\n<\/ul>\n<p>The original buildings were designed and built between 1910 and 1912 by architect Fritz Br\u00e4uning. In several construction phases we will carefully and comprehensively renew these buildings. The additional new buildings complement, renew, and complete a school for the future.<\/p>\n<p>The total funds for the full renovation and the construction of the new buildings amount to more than \u20ac 100 m. We have secured c. \u20ac 65 m for the renovation of the existing buildings, of which over \u20ac 50 m is public funds at the national level and from the state of Brandenburg. The remaining \u20ac 15 m is from private donations.<\/p>\n<p>We are pleased to provide more detailed information about the status of our planning:<br \/>\nStine Peisl (acting managing director)<br \/>\n<a href=\"mailto:info@est.eu\">info@est.eu<\/a><\/p>\n<\/div><\/section><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":10,"featured_media":5776,"parent":7885,"menu_order":30,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7894","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/pages\/7894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/comments?post=7894"}],"version-history":[{"count":5,"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/pages\/7894\/revisions"}],"predecessor-version":[{"id":8171,"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/pages\/7894\/revisions\/8171"}],"up":[{"embeddable":true,"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/pages\/7885"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/media\/5776"}],"wp:attachment":[{"href":"https:\/\/est.eu\/en\/wp-json\/wp\/v2\/media?parent=7894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}